Alois Simon Maaß (Fließer Pfarrer)
Parish priest of Fließ, seer and exorcist 1758 — 1846 Austria

The Reschen Pass Railway and the Great Catastrophe

Partial
1820 AD — Fließ, Tyrol, Austria
Three times an attempt will be made to build the railway over the Reschen Pass, and three times it will fail, because at each beginning a war breaks out. A bridge spanning from the Inn Valley to the Pitztal will be begun but will remain unfinished — and before it is completed, the great world catastrophe will begin.
Partial Fulfilment

The Reschenscheideck railway over the Reschen Pass was surveyed and planned several times across the 19th and 20th centuries but was never completed — projects were repeatedly interrupted by war and political upheaval.

Source
fliess-maass
Century
19th
Recognition
Traditional
tyrolreschen-passrailwaypitztalmaasscatastrophe
Compiled by Meinrad Bader OCist (1899)
by Alois Simon Maaß (oral Tyrolean tradition)

More from Alois Simon Maaß (Fließer Pfarrer) (2)

Signs of the End Times

When the world is encircled with wire and iron, there will be small people. When children dress like apes, Lutheranism will enter Tyrol....

The Inn River and the Tyrolean Villages

When the Inn flows through the mountain past Landeck, not much time remains. Prutz will waste away, Kauns will burn, and Zams will become...

Browse all prophecies